150913-BA
370-man Accommodations/Work/Pipelay Barge
This 370-man Accommodations/Work/Pipelay Barge was built in 2009 and was built to the high safety standards in accordance to IMO ‘MODU CODE’ Resolution A414 Chapter XI. She is designed for unrestricted service and has extensive experience in performing and fulfilling the following duties:
• Hydraulic Work over/ Well Stimulation and Coiled Tubing Services
• Deep Water Mooring Well Intervention
• Offshore Conductor Piling/ Platform Construction Support
• Offshore Platform maintenance
• Offshore Hook-Up and Commissioning
• Sub sea and Dive Support Services
• Accommodation/ Floatel Services
• Purpose Built for Pipelay services
• Upgradable to 500-Men Accommodation
Flag: Indonesia
Located in Indonesia
Technical Details
Principal Dimensions and Characteristics | ||||
Year Built: | 2009 | |||
Classification Society/Notation: |
ABS (American Bureau of Shipping), |
|||
Accommodation & Work Barge | ||||
Length Over All: | 110.57 m | 363 feet | ||
Length Between Perpendiculars: | 106.15 m | 348 feet | ||
Beam: | 31.70 m | 104 feet | ||
Depth: | 7.30 m | 24 feet | ||
Min. Draft: | 3.60 m | 12 feet | ||
Extreme Draft: | 5.08 m | 17 feet | ||
Dead Weight: | 11,355.69 tonnes | |||
Displacement (Max.): | 17,373.18 tonnes | |||
Capacities: | ||||
Cargo Deck Area: | 2,250 m2 | |||
Deck Strength: | 15 tonnes/m2 | |||
Deck Cargo: | 6,584.9 tonnes | |||
Cargo Pumps: | 3,130 cubic meters/hr (4,094 cubic yards/hr) | |||
@ 60 m (197 feet) head | ||||
Fuel Oil Capacity: | 1,500 cubic meters | 1,962 cubic yards | ||
Fresh Water Capacity: | 1,400 cubic meters | 1,831 cubic yards | ||
Accommodation: | ||||
Crew: | Total 15 marine crew | |||
Passenger: | 355 men | |||
Cabins Layout: | 10 x 1 man = 10 | |||
140 x 2 men = 28 | ||||
83 x 4 men = 332 | ||||
Total 107 cabins = 370 men | ||||
1 x Galley | ||||
2 x Mess Rooms | ||||
13 x Offices | ||||
2 x Cinema Rooms | ||||
1 x Recreation Room | ||||
1 x Radio Room | ||||
1 x Central Control Room | ||||
1 x 3 Bed Hospital | ||||
2 x Conference Room | ||||
1 x Gymnasium | ||||
1 x Prayer Room | ||||
Mooring System | ||||
Mooring Winches: | Single drum type, 8 units | |||
Wire Size/Length: | 52 mm x 1,500 m (2 in. x 4,921 ft.), 6 x 25 IWRC | |||
flexible steel wire (8 + 1 spare coil). | ||||
Anchor + Buoy: | 8 + 1 spare x 6 tons Anchors & foam filled buoys | |||
c/w pendant wire. | ||||
Tension Meter+ CCTV: | Tension meter & closed circuit TV monitors | |||
installed. | ||||
Anchor Rack: | Fitted at four (4) corners of the barge for 8-point | |||
mooring. | ||||
Offshore Crane | ||||
Main Crane: | FAVELLE FAVCO PC 200 40/10K - APISPEC 2C | |||
Capacity: | 200 tonnes @ 9.14 m (30 feet) radius at an elevation | |||
of 53.34 m (175 feet). | ||||
Pedestal Crane: | 10 m (33 feet) above main deck | |||
Boom Crane: | 45.72 m (150 feet) Boom | |||
Max. Height Elevation: | 57 m (187 feet) above main sea level | |||
Auxiliary Equipment | ||||
Generators (4): | ||||
Make/Model: | CAT / 3412 DITA Diesel Generators | |||
Power: | 500 kW x 4 | 671 hp x 4 | ||
Output: | 50 Hz each | |||
Life Jackets: | 740 pieces DOT approved (200%) | |||
Life Rafts: | 30 x 25 men total 740 men capacity | |||
Rescue Boat: | 1 x FRC c/w launching davit | |||
Fire Fighting Equipment: | Fire Pumps x 2 | |||
Fire Monitors x 4 | ||||
Engine Room & paint Store Extinguishing System | ||||
CO2 system full coverage | ||||
Water Sprinkler: | Available | |||
Fresh Water Maker: | 2 x Reverse Osmosis, 80 tons/24 hours each. | |||
(Total 160 tons/day) | ||||
Helideck | ||||
Dimension: | 24 m x 24 m (79 ft. x 79 ft.) for Sikorsky "S61N" | |||
Standard: | In compliance to Classification & CAP 437 | |||
Helicopter: | Sikorsky "S61N" | |||
Communication | ||||
Radar: | 1 x RayMarine C120 Radar | |||
Radios VHF: | 2 x Samyung STR 600A 183 Channels | |||
Echo Sounder: | 1 x Samyung | |||
Weather Data: | 1 x Navtex (Samyung) | |||
G.P.S.: | Yes (Samyung) | |||
Radios HF: | 1 x Samyung SRG1150DN MF/HF Radio | |||
Handheld Walkie Talkie: | 6 x Motorola GP328 VHF/Walkie Talkie | |||
VHF/AM Aero=Transmitter: | 1 x ICOM | |||
Control Station: | Yes, Central Control Room with full view | |||
of the entire working deck | ||||
P. A. Systems: | Yes, Throughout the Barge | |||
AIS: | 1 x Samyung | |||
Inmarsat System Satellite: | 1 x Inmarsat-C | |||
Comms: | 1 x Mini-M, Thrane & Thrane | |||
All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice. |